Access the Full Project by Clicking here!
Bidjugde
JOB
(PREQUAL) 96 inch 87 inch Settled Sewer Pipe Rehabilitation
BID DATE
09/15/19 - 5:00
AGENCY
San Jose
ESTIMATE
$3,725,000
SCOPE
Michels Pipeline Construction; Insituform Technologies; SAK Construction; 96‐inch SES Pipeline: 96‐inch diameter circular reinforced concrete pipe (RCP), 532 LF in length and constructed in 1961 2. 87‐inch x 136‐inch SES Pipeline: 87‐inch x 136‐inch oval RCP, 377 LF in length and constructed in 1961 The Projectscope will include but not be limited to re‐establishment of the temporary flow reroute system furnished by the City, rehabilitation of the 96‐inch SES pipeline using Cured in Place Pipe (CIPP) method and 87‐inch x 136‐in SES pipeline using Concrete Crown Repair, and site restoration. The Project will need to be conducted during the 2020 dry weather seasons and coordinated with other CIP construction projects and/or O&M activities as well as the RWF’s operational/shutdown constraints. The dry weather seasons are defined as April 16 – October 15.
UPDATES