I 15 Median Stabilization
BID DATE
03/20/19 - 2:00
AGENCY
State Utah
ESTIMATE
n/a
SCOPE
stabilize a landslide located in the median of I-15, adjacent to the north bound lane at MP 35.3. The length of the slide is roughly 65 LF. The work will consist of removing the unstable soil down to firm soil, benching the undisturbed soil, and placing approximately 900 cubic yards of loose riprap and approximately 60 cubic yards of granular borrow to re-establish the slope. The loose riprap and granular borrow/pit run will be separated by a filter fabric. At the toe of the loose riprap, large boulders will be placed to function as a type of buttress. Cody Nelson codybnelson@utah.gov