Access the Full Project by Clicking here!
Bidjugde
JOB
600 East 1200 North 1150 North Sewer Line Replacement
BID DATE
03/22/19 - 2:00
AGENCY
Logan
ESTIMATE
n/a
SCOPE
1 Mobilization Lump Sum 1 2 Traffic Control Lump Sum 1 3 Prepare and Implement Storm Water Best Management Practices Lump Sum 1 4 Survey Lump Sum 1 5 Provide Quality Control Testing Lump Sum 1 6 Sewer By-Pass Pumping Lump Sum 1 7 Saw Cut Existing Asphalt Lineal Feet 2350 8 Remove Existing Asphalt Square Feet 8750 9 Trench Excavation Tons 5700 10 Install 8-Inch SDR 35 Sewer Line Lineal Feet 720 11 Reconnect Existing Sewer Lateral to Existing 8-Inch RCP Each 1 12 Reconnect Existing Sewer Lateral to 8-Inch SDR 35 Each 11 13 Install 60-Inch Sewer Manhole Each 3 14 Install 48-Inch Sewer Manhole Each 1 15 Construct Granular Borrow Ton 4200 16 Construct Untreated Base Course Ton 950 17 Construct Hot Mix Asphalt, 4 Inches Thick Square Feet 8,750 18 Install Manhole Concrete Collar Each 4 tyler.cady@loganutah.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT