Access the Full Project by Clicking here!
Bidjugde
JOB
CA FTNP SEKI 10 12 Generals Highway
BID DATE
03/15/19 - 2:00
AGENCY
Department Transportation
ESTIMATE
$25,000,000
SCOPE
This project consists of roadway resurfacing, restoration, and rehabilitation of approximately 18.2 miles of roadway within Sequoia and Kings Canyon National Park and the Sequoia National Forest, Tulare County, California, including the Generals Highway from 1 mile east of the State Route 180 intersection to the Little Baldy Saddle. Work also includes rehabilitation/reconstruction of multiple parking areas, and drainage improvements, including culvert cleaning, lining and replacement. The terrain is mountainous with the elevation for the work ranging between 6,400 and 7,600 feet. 46,000 tons of asphalt concrete pavement, gyratory mix, 74,000 linear feet of concrete curb, 17,000 tons of aggregate base, 18.2 miles of full depth reclamation, 17,000 square yards of asphalt paved ditch, 40 each stone masonry headwalls, 900 cubic yards of riprap, 800 linear feet of lining pipe culverts, and 1,200 linear feet of metal pipe culverts. sheri.muehl@dot.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT