Ebbetts Pass Technite Pipeline Replacement
BID DATE
04/23/19 - 2:00
AGENCY
Calaveras County WD
ESTIMATE
$1,250,000
SCOPE
The proposed project is to replace approximately 7,000-feet of 14-inch diameter Techite water main. Also, considering the rocky soil conditions in the vicinity of the project, the District believes the best approach for construction is to install a new 10-inch water main in the same location and alignment as the existing Techite line. For this approach, the project first requires construction of temporary bypass piping and temporary service laterals to maintain water supply to homes along the alignment, next followed by excavation, demolition and removal of the existing Techite line, and then completing construction and installation of the new 10-inch water main in the same trench. The Engineer’s estimate of probable construction cost is $1.25 million.