2018 19 Pavement Rehabilitation
BID DATE
03/19/19 - 2:00
AGENCY
Danville
ESTIMATE
$2,743,764
SCOPE
The work generally includes, but is not limited to, preparatory tree trimming, removal and replacement of existing Portland Cement Concrete curb, sidewalk, curb ramp, removal and replacement of existing asphalt concrete pavement (dig-outs), pavement cold planning, installation of hot mix asphalt concrete, removal, removal and replacement of new traffic signal loop detectors, adjusting to grade of survey monument castings, water valve castings, storm drain and sanitary sewer manhole covers, and other utility lids, removal and replacement of existing pavement striping and markers, traffic control, and other items that are required by the plans, standard specifications, or these Special Provisions. nsalama@danville.ca.gov engineering@danville.ca.gov