Access the Full Project by Clicking here!
Bidjugde
JOB
Clearfield City Cornerstone Park Improvements
BID DATE
03/19/19 - 3:00
AGENCY
Clearfield
ESTIMATE
$109,075
SCOPE
The work includes, but is not limited to, furnishing all labor, tools, materials, equipment, transportation, and services required for construction of the above project; and mobilization; obtaining all bonds and insurance, saw cutting asphalt and concrete along with removal of curb and gutter, sidewalk and existing asphalt roadway materials, furnishing and installing approximately 365 feet of 8-inch sanitary sewer pipe along with the associated 4-foot diameter manholes, furnish and installing 12-inch diameter storm water piping along with inlet catch basins, furnishing and the installation of a inlet catch basin atop an existing 24-diameter storm water pipe, approximately 140-feet of 1-1/2-inch diameter copper water piping, furnish and installing approximately 320-feet of curb and gutter, furnish and installing 4” and 6” thick concrete sidewalk and 2-each 24-foot wide driveway approaches, furnishing and installing approximately 525 tons of roadbase and 205 tons of asphalt for patching the roadway and constructing a parking lot, furnish and installing a 25-foot by 30-foot roadbase pad for a pre-cast restroom building (furnished by others), furnish and installing approximately 410-feet of 2-inch diameter underground electrical conduit and wiring along with electrical connection to an existing service panel and all appurtenant work in accordance with the Drawings and Specifications prepared by the Engineer, CEC, Civil Engineering Consultants, PLLC. Wendy Page +801 (525) 2707 wendy.page@clearfieldcity.org Nancy Dean +1 801-525-2714 ndean@clearfieldcity.org Eric Howes +1 801-525-2793 ehowes@clearfieldcity.org
PREBID
3/13/2019 8:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT