Access the Full Project by Clicking here!
Bidjugde
JOB
MacArthur Blvd University Drive Pavement Rehabilitation
BID DATE
03/20/19 - 10:00
AGENCY
Newport Beach
ESTIMATE
$2,700,000
SCOPE
The work necessary for the completion of this contract consists of mobilization anddemobilization; distribution of construction notices to existing businesses and residents;best management practices (BMP); traffic control and detour plan implementation;construction staking, survey monument restoration, and survey monument adjustments;utility company coordination and utility verification; removal of existing roadway,sidewalk, curb and gutter, access ramps, concrete pavement bus pad, and driveways;cold milling of existing asphalt pavement roadway; subgrade preparation; constructionof asphalt concrete (AC) pavement, asphalt rubberized hot-mix (ARHM) pavement, fiberreinforced ARHM pavement, local pavement section repairs, PCC sidewalks, PCC curband gutter, PCC access ramps, truncated domes, PCC driveways, PCC median curbs,and PCC pavement for bus pad; utility relocations and adjustments; traffic signal andtraffic signage improvements; pavement striping and marking improvements; as-builtplan preparation; and all other work required by the contract documents. Patricia Kharazmi - 949-644-3344 pkharazmi@newportbeachca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT