Access the Full Project by Clicking here!
Bidjugde
JOB
Conejo Creek North Park Waterline Rehabilitation
BID DATE
03/27/19 - 4:30
AGENCY
Thousand Oaks
ESTIMATE
n/a
SCOPE
The general items of work include: install cured-in-place (CIPP) liner to rehabilitate approximately 830 linear feet of 16-inch diameter existing welded steel pipeline with reinstating an existing air release and vacuum valve assembly, replace approximately 575 linear feet of existing 16-inch steel pipeline with new 12-inch C900 DR 14 PVC pipe including all associated joints, bends & fittings, trust blocks, saw cutting, pavement removal, trench excavation, shoring, back filling, disinfecting and pressure testing, asphalt paving, removing and re-installing reinforced concrete encasement, removal and salvage of two existing butterfly valves, furnishing and installing three 12-inch new butterfly valves, removal of two air release and vacuum valve assemblies, furnishing and installing two air release and vacuum valve assemblies, removal and proper disposal of AC pipe with Asbestos Abatement, abandoning a portions of existing 16-inch pipe with cement sand slurry fill as shown on drawings, pavement, curb and gutter repairs, adjustment of utility access covers to the grade, replacement of 3’x4’ storm drain inlet and concrete collar in kind, reinstallation of striping and pavement marking, landscape restorations and repairs back to the existing site condition, as per specifications. isavulescu@toaks.org
PREBID
3/13/2019 10:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT