Access the Full Project by Clicking here!
Bidjugde
JOB
Lower Mission Creek Flood Control Reach 2 Phase 2 Reach 3
BID DATE
01/30/20 - 2:00
AGENCY
Santa Barbara County
ESTIMATE
n/a
SCOPE
The Project generally consists of providing water pollution control; traffic control; temporary shoring; removal of existing drainage and parking lot improvements; channel excavation; construction of a reinforced concrete weir structure and by-pass channel; construction of approximately 200 linear feet of CIDH Secant Pile wall system with architectural treatment, installation of Rock Slope Protection, fabrication and installation of by-pass channel metal debris rack; installation of fencing and railings; and construction of new drainage facilities and parking lot improvements.
PREBID
1/21/2020 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT