West Anthem Lift Station Force Main Improvements
BID DATE
03/12/19 - 2:00 LIVE!
AGENCY
Phoenix
ESTIMATE
$6,069,439
SCOPE
ALTERNATES: T&T: lift station= $3,068,961 force & water main = $6,570,399 total = $9,639,360 Redpoint: lift station = $1,839,771 force & water main = $4,641,118 total = $6,480,889 Achen: lift station = $2,531,031 force & water main = $5,000,301 total = $7,531,332 The City of Phoenix is seeking a qualified construction contractor to perform the following scope of service, including but not limited: general site work, earthwork, and paving; construction of wet well and manholes; general above ground and underground piping and valve improvements; masonry wall and retaining wall structures; submersible pump equipment; electrical, instrumentation, control, and security improvements; approximately 4,554 linear feet of double barrel 18-inch and single barrel 8-inch sanitary sewer force main; approximately 80 linear feet of double barrel 26-inch and single barrel 10-inch sanitary sewer force main; approximately 3,427 linear feet of 4-inch potable water main including tapping sleeve and gate valve, and isolation valves with VB&C; pavement removal and replacement along the force main and water main alignment; access road grading and reclaimed asphalt pavement surfacing; connection to force main stub-outs at the force main discharge; and approximately 965 linear feet of APS utility 4-inch ductbank / conduits. A Small Business Enterprise goal of 4% has been established for this project. The Engineer's Estimate for this project is $5,462,496 to $6,676,384. Please submit all questions related to this procurement by email to george.goodale@phoenix.gov.
UPDATES