Access the Full Project by Clicking here!
Bidjugde
JOB
SR202L Pecos Rd Sanitary Sewer Chandler Boulevard 17th Avenue Phase 2
BID DATE
03/19/19 - 2:00 LIVE!
AGENCY
Phoenix
ESTIMATE
$2,123,630
SCOPE
The scope of work for Phase 2 includes installation of approximately 5,300 linear feet of 15-inch diameter sanitary sewer that is within Arizona Department of Transportation (ADOT) right-of-way of State Route 202 Loop (previously Pecos Road alignment) and Arizona State Land property. The project is on the north side of the freeway within the landscape and drainage area. The project extends from an existing stub-out located in Chandler Boulevard at the west end of the project to a manhole connection at 19th Avenue at the east end of the project. Construction will include the installation of approximately 13 polymer concrete sanitary sewer manholes. This is the second phase of a three-phase project. The contractor should anticipate hard dig conditions for the sewer installation. Also, the work will require extensive coordination with ADOT and Connect 202 Partners. An SBE goal was not established for this project due to the lack of work relating to SBE subcontractors. The Engineer's Estimate is $1,911,267 to $2,335,993. Any questions related to this posting contact Julie B. Smith at (602) 534-2418 or julie.b.smith@phoenix.gov
UPDATES