Access the Full Project by Clicking here!
Bidjugde
JOB
Improvements 164th Ave Blossom Way Bus Shelter E14th St 159th Ave
BID DATE
03/5/19 - 2:00
AGENCY
Alameda County Public Work
ESTIMATE
n/a
SCOPE
The project consists of providing water pollution control; providing traffic control system; removing existing AC berm and sidewalk, and concrete sidewalk; constructing concrete curb, gutter, pervious concrete sidewalk and driveways, pedestrian ramps, and driveway and walkway conforms; milling existing asphalt concrete pavement, constructing full depth AC conforms, and installing 2 AC overlay; installing Bus Shelters on E. 14th Street; filing corner records; and the furnishing of all labor, materials, tools, equipment, mechanical workmanship, transportation, and services necessary to be done in order to perform a complete said project.
PREBID
2/19/2019 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT