Access the Full Project by Clicking here!
Bidjugde
JOB
ASDB Building Renovations Phase II Maricopa and Palo Verde Dormitories
BID DATE
01/7/14 - 3:00
AGENCY
ADOA
ESTIMATE
$1,000,000
SCOPE
All new dropped ceilings in the dorm rooms, halls, accessory spaces except for the bathrooms. 3.2.1.2 Extend existing HVAC grills, new lights to the new dropped ceiling. 3.2.1.3 Complete removal of existing bathrooms, enlarge bathroom foot print by removing existing adjoining closets, and reconfigure bathrooms to include toilets, lavatories/sinks, ADA accessible showers. (Alternate might include whirlpool tub) new tile walls, floor, water resistant ceiling and new lighting. 3.2.1.4 Conversion dorm rooms 3.2.1.5 Alternate to include a Warming Kitchen area and Laundry (washer/dryer room) 3.2.1.6 Renovate Kitchen Area 3.2.1.7 Renovate Laundry Washer/Dryer room 3.2.1.8 Refurbishment/replacement of existing interior doors such as, bedroom doors, closets, etc. 3.2.1.9 Removal of existing of all wall radiators/ventilators 3.2.1.10 Repair any existing cracks in the walls. (Existing finish is plaster over masonry) 3.2.1.11 Paint complete all interior rooms, closets, offices, laundry, bathrooms. Email: Terry.Gutman@azdoa.gov Phone: (602)542-1935

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT