Access the Full Project by Clicking here!
Bidjugde
JOB
SR 248 Bicycle Pedestrian Access
BID DATE
02/28/19 - 4:00
AGENCY
Park City
ESTIMATE
n/a
SCOPE
the work generally consists of the construction of 120 LF of a 9x12 box culvert pedestrian tunnel under SR 248 (Kearns Blvd) in Park City, UT along with appurtenant stair wells, ADA ramps, retaining walls, pathway improvements, and re-routing 660 LF of 18” SBWRD sanitary sewer main around the tunnel. Work will also include Rocky Mountain Power primary electrical systems improvements as well as integration of solar panels and an electric snowmelt system. Contract to include replacement of existing asphalt path, roadway, gutter, sidewalk, landscaping, concrete driveway, and other existing site features as required to accommodate the pedestrian tunnel. The project is located within the Park City Soil Ordinance Area. Bidders should familiarize themselves with related requirements that may impact construction activities prior to preparing and submitting a bid. CathyL@horrocks.com robs@horrocks.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT