Access the Full Project by Clicking here!
Bidjugde
JOB
Street Rehabilitation Surface Seals FY 2019
BID DATE
02/21/19 - 2:00
AGENCY
Berkeley
ESTIMATE
$5,500,000
SCOPE
The work done under these specifications includes but is not limited to: traffic control, environmental protections, adjustment of valve boxes and utility boxes, frames, and covers, replacement of survey monuments, protection and relocation of underground utility services (e.g. gas, water, sewer, electrical, telecom), concrete curbs and gutters, sidewalk, curb ramps, driveways, cross drains at curb ramps, storm drain pipe replacement, storm drain inlets, crack sealing, base failure repairs, surface sealing, pavement milling, removal and disposal of pavement surfaces and base materials, subgrade preparation, proof rolling including over-excavation, stabilization and compaction, aggregate base course, hot-mix asphalt (HMA) and rubberized hot-mix asphalt (RHMA) paving, pavement markings, striping, and markers, and traffic loops as specified. wwong@CityofBerkeley.info

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT