JOB
WWTP Phase I Improvements
BID DATE
01/16/14 - 2:00
AGENCY
Winslow
ESTIMATE
$3,000,000
SCOPE
Modifying and improving the treatment processes at the existing City of Winslow 2.2 MGD Wastewater Treatment Plant. The modifications and improvements shall include, but are not limited to the following: Civil, architectural, mechanical, structural, and electrical and control works shown in the Contract Documents; Coordination of all work with the City’s Engineering and WWTP Operational staff; Furnishing and installation of new filtration system and associated upgrades to the filtration areas including structural, mechanical, electrical and controls; Removal of the existing east traveling bridge sand filtration system and rehabilitation of the existing west traveling bridge sand filtration; Furnishing and installation of a new shade canopy over the filtration area; Modifications to the existing Traveling Bridge Sand Bed Filter Beds for installation of a new Packaged Tertiary Filtration System, bypass piping, valving, and instrumentation; Modifications to the existing Dewatering Building for the installation of a new mechanical sludge dewatering system, complete with associated process mechanical, electrical, and instrumentation improvements; Testing, commissioning, and startup of the new equipment and improved process areas within the plant. More detailed scope is included in the Engineering Specifications

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT