Red Mountain Erosion 3 Poles
BID DATE
03/1/19 - 11:00
AGENCY
SRPMIC
ESTIMATE
$180,000
SCOPE
The proposed Work for the Red Mountain – Erosion 3 Poles shall consist of correcting erosion damage on the bank of the Salt River and improve existing drainage conditions with a gabion structure and erosion control mats. The work includes but is not limited to the following; clearing & grubbing for erosion control, tree removal and haul off of debris, over excavation for gabion, erosion control mat & woven filter fiber construction, gabion anchor & gabion construction, backfill & fill construction behind gabion structure, Enviroflex lined trapezoidal channel section construction, angular riprap construction, final grading and Flooding Mitigation Plan during Construction. Purchasing-Bids@srpmic-nsn.gov