Access the Full Project by Clicking here!
Bidjugde
JOB
Canyon Gap Trail Roadway
BID DATE
01/31/19 - 2:00
AGENCY
Cottonwood Heights
ESTIMATE
n/a
SCOPE
Work for roadway paving and trail project (Project # CHC.294) consists of the following items of work: mobilization, traffic control, earthwork and grading, relocation of existing concrete structures, asphalt surface trail construction, concrete cubing, rockery retaining walls, signage, storm drain piping and structures, reconstruction of miscellaneous structures to grade; rotomilling existing pavement; placing and compacting new asphalt surface course; construction of new asphalt overlay, tack coat, traffic paint striping, messages; and all appurtenant work; all in accordance with Drawings and Specifications prepared by the Engineer; Gilson Engineering.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT