Access the Full Project by Clicking here!
Bidjugde
JOB
2018 CDBG Street Improvement
BID DATE
02/21/19 - 3:00
AGENCY
San Gabriel
ESTIMATE
$400,000
SCOPE
The scope of work includes, but is not limited to the following: excavation and hauling of existing asphalt concrete and base material, removal of existing sidewalk, non-ADA curb ramp, and curb and gutter; cold milling, construction of crushed miscellaneous base (CMB), construction of asphalt concrete (AC), crack sealing, slurry seal, construction of PCC Curb and gutter, PCC sidewalk, ADA curb ramp, adjusting water valve box and cover to grade, adjusting manhole frame and cover to grade, furnishing and installing blue reflective pavement marker adjacent to fire hydrants, adjustment of survey monuments and ties, furnishing and installing pavement striping, markings and markers, and other incidental and appurtenant work necessary for the proper construction of the contemplated improvements as indicated on the maps, sketches and spreadsheets contained within the specifications. The scope of work shall include all labor, materials and equipment necessary to complete the project as outlined herein and on the plans. amao@sgch.org
PREBID
2/7/2019 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT