Access the Full Project by Clicking here!
Bidjugde
JOB
Annual Street Repair Resurfacing Arterial Collector Overlay
BID DATE
02/12/19 - 2:00
AGENCY
Los Gatos
ESTIMATE
$1,900,000
SCOPE
The project consists of grinding of the existing pavement, placement of cold-in-place recycled pavement, leveling course, hot mix asphalt, and rubberized hot mix asphalt, digout repairs, adjustment of manholes, valves, boxes, and monument covers, replacement of traffic signal loops, placement of new bike loops and video detector cameras, and placement of new pavement stripes and markings. The engineer’s estimate for the project is $1.7-1.9 million. https://www.printscharlesplanroom.com/jobs/18/details/annual-street-repair-resurfacing-arterialcollector-overlay-18-811-9901

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT