Access the Full Project by Clicking here!
Bidjugde
JOB
Wastewater Pond Liner Replacement
BID DATE
03/5/19 - 2:00
AGENCY
Pinal County
ESTIMATE
n/a
SCOPE
The intent of this Invitation for Bid is for Pinal County to obtain the services of a qualified Contractor to install new HDPE liners at the wastewater pond located at 11 Mile Corner. Contractor shall provide all labor, materials, supplies, tools, equipment, permits and licenses, bonds and every other expense necessary to remove and dispose of sludge, as well as remove and replace wastewater pond liners and aeration pumps. 4 ponds to be drained. All sludge must be removed and disposed of • 16 existing isolation valves are to be replaced with 6 inch Milliken check valves • Existing liners are to be removed • Grade will need to be reworked to meet compaction and grade specifications for new liners • New 60 mil HDPE Liner installed • Install new Otterbine Barebo Concept 3 three phase, three horsepower aerator pumps on ponds one and two • Replace flow meter at wet well • Repair ultraviolet disinfection system Lorina.Gillette@pinalcountyaz.gov
PREBID
2/12/2019 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT