Access the Full Project by Clicking here!
Bidjugde
JOB
Sand Hollow Regional Pipeline Phase B
BID DATE
02/12/19 - 4:00
AGENCY
Washington County Water Conservancy District
ESTIMATE
n/a
SCOPE
The project will consist of installation of approximately 13,800 lineal feet of 36” ductile iron pipe with associated fittings, 7 air/vacuum valve assemblies, 1 drain assembly, and 3 future tie-in assemblies with metering vaults. The project will also include the installation of approximately 13,800 lineal feet of 2❠HDPE conduit and associated pull boxes adjacent to the pipe line. The project is located approximately 6 miles southeast of St. George, Utah, in the vicinity of Washington Fields. The owner is furnishing the 36” ductile iron pipe and fittings, and 6”, 10”, 12”, 20” and 36” water valves.
UPDATES