Sand Hollow Regional Pipeline Phase A
BID DATE
02/12/19 - 4:00
AGENCY
Washington County Water Conservancy District
ESTIMATE
n/a
SCOPE
The project will consist of installation of approximately 39,400 lineal feet of 36” ductile iron pipe with associated fittings, 16 air/vacuum valve assemblies, 8 drain assemblies, a cased crossing of the Southern Parkway, and a tie-in to an existing 30” culinary water line. The project will also include the installation of approximately 9,700 lineal feet of 2” HDPE conduit and associated pull boxes adjacent to the pipe line. The project is located approximately 8 miles east of St. George, Utah, in the vicinity of Sand Hollow Reservoir and Warner Valley. The owner is furnishing the 36” ductile iron pipe and fittings, and 6”, 12” and 36” water valves.