Access the Full Project by Clicking here!
Bidjugde
JOB
Ortega Road Widening Sidewalk Gap Closure Phase 2
BID DATE
02/12/19 - 2:00
AGENCY
Cathedral City
ESTIMATE
n/a
SCOPE
The limits of the work are as indicated on the plans. In general, the work to be done consists of furnishing all labor, materials, necessary tools, equipment, supervision, and all utility and transportation services required to construct new curb, gutter and sidewalk on the north side of Ortega Road from Campus Lane to Rancho Vista Drive including new AC pavement and base, new sidewalk, curb and gutter, ADA compliant ramps, AC pavement patching, adjust water valves and sewer manholes to grade, and signing and striping.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT