Access the Full Project by Clicking here!
Bidjugde
JOB
Wastewater System Rehabilitation CDBG
BID DATE
02/19/19 - 2:00
AGENCY
Kearny
ESTIMATE
$230,900
SCOPE
Rehabilitation of approximately 2,582 linear feet (LF) of existing sanitary sewer pipe line. The rehabilitation method shall primarily be installation of cured-in-place pipe (CIPP) lining to remedy and repair fractured and broken sections of pipe. The existing pipe material is vitrified clay pipe (VCP) with several sections of ductile iron pipe (DIP) located beneath the railroad tracks. The pipe rehabilitation work also includes all miscellaneous and contingent items of work including mobilization, traffic control, plugging sewer lines, by-pass pumping of sewage flows around the work sites, quality control testing and reporting, manhole repairs, excavation, backfill, pavement replacement (if needed), pipe installation and connections (if required), and site restoration; sewer line rehabilitation, cured-in-place pipe lining, manhole repair, trenching and backfilling, road surface restoration, and related sanitary sewer line construction. cwoolery@townofkearny.com khebert@cagaz.org
UPDATES