Access the Full Project by Clicking here!
Bidjugde
JOB
Hillview Road Woodside Road Drainage Improvement
BID DATE
02/14/19 - 2:00
AGENCY
Berkeley
ESTIMATE
$220,000
SCOPE
The work done under these specifications includes but is not limited to: traffic control, directional drilling for installation of new storm drain pipe, open trench construction, reconstruction of storm drain features, new drainage structures, curb and gutter, removal and abandonment of existing corrugated steel pipe, tree removal, excavation safety, traffic control, and pavement restoration. Adjustment of valve boxes and utility boxes, frames, and covers, protection of underground utility services (e.g., gas, water, sewer, electrical, telecom), concrete curbs and gutters, sidewalk, and markers as specified. smuktevi@cityofberkeley.info

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT