Access the Full Project by Clicking here!
Bidjugde
JOB
Cornell Lift Station Water Quality Improvements
BID DATE
02/8/19 - 2:00
AGENCY
Salt Lake
ESTIMATE
$2,200,000
SCOPE
Construction of an end-of-line storm water treatment facility.  Replacing existing pumps with new pumps,  Manifolding pump discharge piping into one discharge pipe,  Installing new 24” HDPE pipe,  Installing a flow splitter box,  Installing a low flow hydrodynamic separator,  Constructing aeration cascades for both low flows and high flows,  Constructing an outdoor classroom area with educational features and facilities,  Realigning the existing Jordan River Trail,  Excavating existing materials to widen the floodplain and provide a location where storm water can be polished using natural vegetation and filtering processes,  Constructing a precast concrete boardwalk to overlook the expanded floodplain  Constructing a new canoe/kayak launching area,  Installing sprinklers and vegetation,  Constructing three separate Low Impact Development demonstration areas for treating storm water and  Installing improvements to enhance the facilities described. Kevin Kranendonk +801 (483) 6841 kevin.kranendonk@slcgov.com
PREBID
1/23/2019 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT