Access the Full Project by Clicking here!
Bidjugde
JOB
Misc Alleys Cliffwood Industrial Park Improvements
BID DATE
02/19/19 - 3:00
AGENCY
Brea
ESTIMATE
$2,800,000
SCOPE
Rehabilitation of Alley East of Redwood Ave. between Birch. St. and Ash St., Project 7315 - This project will reconstruct the asphalt pavement, concrete pavement, curb, and two driveways. Rehabilitation of Alley East of Puente St. between Joyce Dr. and Walling Ave., Project 7316 – This project will reconstruct the asphalt pavement, concrete pavement, construct 4-foot wide longitudinal gutter, and driveway. Rehabilitation of Streets and Waterline Improvements for the Cliffwood Industrial Tract, Projects 7317 & 7461 – This project will replace approximately 5,500 linear feet of existing water mains and the rehabilitation and reconstruction of the commercial streets in the Cliffwood Tract. The project also to include the removal and replacement of existing damaged sidewalk, concrete curb and gutter, curb ramps, cross gutters, and localized AC pavement, along with the adjustment of existing utilities to grade, traffic signage and striping, traffic control, and all other improvements required to complete the project. raymondc@cityofbrea.net
UPDATES