Hasler Valley Road Concrete Box Culvert
BID DATE
01/29/19 - 2:00
AGENCY
Gallup
ESTIMATE
n/a
SCOPE
The project consists of removing two (2) existing 60 inch CMP culverts and replacing them with a new concrete boxed culvert bridge consisting of three (3)-10 foot x 12 foot cells. Work shall include demolition of existing road, installation of new asphalt pavement surface, excavation and backfill for the new culverts, concrete spillway with energy dissipators, rip rap, new permanent signage, nonwoven geotextile, geogrid reinforcement, and guardrails. Traffic control and installation of temporary bypass road will also need to be provided.