Access the Full Project by Clicking here!
Bidjugde
JOB
US 101 Pedestrian Undercrossing
BID DATE
01/30/19 - 3:00
AGENCY
Redwood City
ESTIMATE
$3,500,000
SCOPE
The City of Redwood City is soliciting bids from qualified contractors to furnish and install a 14-foot wide joint-use path to be constructed under the US 101 freeway bridge between the northern bridge abutment and Redwood Creek including preparing and implementing a stormwater pollution prevention plan, clearing and grubbing, installing a temporary cofferdam, a sub-horizontal ground anchor wall on the abutment side and a retaining wall on the creek side, required testing, a concrete joint use path, pipe piles, railings, wall lights, conduits, access gates, emergency call boxes, cathodic protection, pavement striping and marking; existing sidewalk removal and replacement, path lights including pull boxes, conduits, conductors, concrete foundations, trench and backfill, pavement repair, signage, site furniture, landscaping, irrigation, planting, landscape maintenance and daily site clean-up, site safety and other related work activities. jevora@redwoodcity.org
UPDATES