Access the Full Project by Clicking here!
Bidjugde
JOB
Residential Street Rehabilitation FY 2016 2018 Annual Water Main Replacement Program FY 2017 2018
BID DATE
01/18/19 - 3:00
AGENCY
La Habra
ESTIMATE
$5,910,000
SCOPE
The Work comprises the furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work to be performed here under consist of but is not be limited to Mobilization; Storm Water Best Management Practices; Construction Staking and Monument Perpetuation; Traffic Control; Excavation; Construction of Water Pipelines, Valves, Fittings, Hydrants, and Water Services; Removing Conflicting Pipes, Valves, and Fittings; Abandoning Existing Waterline and Water Services; Pavement Grinding; Asphalt Concrete Paving; Pavement Reconstruction; Concrete Work; Signage, Striping, and Markings; Traffic Loops Installation; and all associated work as identified on the construction plans. Joseph Khilla, PE (562) 383-4164 City of La Habra

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT