2018 Western Drain Bank Improvement
BID DATE
12/19/18 - 2:00
AGENCY
Farr West
ESTIMATE
$139,031
SCOPE
The Project consists of clear and grub the canal banks of all vegetation, shrubs and trees in the area south of the existing Smith Family Park pond, including area up to an existing 6’ chain link fence. Excavate existing banks for rip-rap and place a nonwoven fabric in all areas cleared. Install approx. 1,447 tons of 18” normal size rip-rap approx. 24†thick in area excavated on the banks of the canal and “key” the fabric and rip-rap into the floor of the canal. Approx. 570 tons of 6” minus rip-rap is to be placed in the area from the top of the rip-rap to the existing fence. Construct 156 lf of 6’ chain link fence around the east end of the Western Drain by the banks of the Willard Canal.