Access the Full Project by Clicking here!
Bidjugde
JOB
Hood Storage Tank Water Treatment Plant Improvement Project Phase 2
BID DATE
01/24/19 - 3:00
AGENCY
Sacramento County
ESTIMATE
$3,514,000
SCOPE
In general, the work to be performed under this contract includes the furnishing of all labor, materials, professional services, and equipment for the construction of a new groundwater treatment plant and an on-site well. Proposed facilities include: 100,000 gallon water storage tank; treated water pump station; surge tank; manufacturer supplied pressure filter treatment system including 5,300 gallon backwash storage tank, reclaim and backwash pumps; sodium hypochlorite feed system. Also building; fluoride treatment system; piping system; site grading and paving; landscaping; equipping the on-site well with pump, valves and piping; site piping; electrical system; instrumentation and controls; and other work, equipment, and facilities as required for a working water treatment plant. The work shall be accomplished within the project boundaries as shown or described on the Contract Drawings. nguyent@saccounty.net
UPDATES