Access the Full Project by Clicking here!
Bidjugde
JOB
2018 Annual Surface Seal
BID DATE
12/20/18 - 2:00
AGENCY
San Marcos
ESTIMATE
n/a
SCOPE
The work is comprised of mobilization, demobilization, final cleanup, traffic control, stormwater pollution prevention and erosion control, traffic control and construction staging, Signing and West Mission Road and Twin Oaks Valley Road per Plans; The modification of existing traffic signal at (Twin Oaks Valley Road & Windy Way, Twin Oaks Valley Road & Borden Road, Rancho Santa Fe & West Mission Road, Las Posas & West Mission Road, and Aberdeen & West Mission Road) per Plans; Type II Emulsion Aggregate slurry seal with 2.5% Latex (Bailey Court, Diamond Street and Opal Street) per Appendix A; 5/16” Chip and Cape Seal (Armorlite Drive, Vallecitos De Oro, Bingham Drive, North Pacific Street, and West Mission Road) per Appendix A; Type III Emulsion Aggregate slurry seal with 2.5% Latex (Twin Oaks Valley Road and Borden Road) per Appendix A; Type I/Type III Emulsion Aggregate slurry seal with 2.5% Latex (Elm Tree Lane & Robin Hill Drive) per Appendix A; Traffic Loop replacement ( West Mission Road & North Pacifica, West Mission Road & Palomar College, West Mission Road & Comet Circle West, Twin Oaks Valley Road & Richmar, and Twin Oaks Valley Road & Del Roy) per Appendix D; temporary and permanent pavement striping, public noticing and business coordination, crack sealing, Dig-outs, temporary and permanent pavement markers, surface preparation, removal of raised pavement parkers, removal of striping, removal of thermoplastic pavement legends and other related appurtenant work as required to complete the improvements. Ramona Edwards - 760-744-1050 x3192 redwards@san-marcos.net
UPDATES