Rio Linda Blvd Bridge Replacement Main Avenue Realignment
BID DATE
01/9/19 - 2:00
AGENCY
Sacramento
ESTIMATE
$5,484,125
SCOPE
The project includes the removal and reconstruction of the Rio Linda Boulevard Bridge over Magpie Creek. This project provides for, in general, bridge removal and construction of a new bridge, replacing and bypassing the 48" sanitary sewer main, placing 12" and 24" watermains, roadway drainage systems, realigning Magpie Creek, planting the realigned creek, realigning the Sacramento Norther Bike Trail, raising and widening the roadways, pavement markings, roadside signs, traffic signal, planting, channel revegetation, and drainage improvements as shown on the plans and as directed by the Engineer. Jose Ledesma JLedesma@cityofsacramento.org