Access the Full Project by Clicking here!
Bidjugde
JOB
2018 Street Sewer
BID DATE
12/18/18 - 2:00
AGENCY
Mill Valley
ESTIMATE
$2,100,000
SCOPE
Annual street and sewer rehabilitation implementation of storm water pollution and prevention; traffic control; potholing to locate utilities; asphalt removal by milling or other means; removal and replacement of concrete curbs and gutters, sidewalks, pedestrian ramps, and driveways; clearing and grubbing, excavation, subgrade preparation, placement and compaction of aggregate base; localized pavement and subgrade repairs; rehabilitation of sanitary sewer pipelines by open trenching and pipe bursting; reconnection and repair/replacement of sewer laterals; installation of storm drain facilities and drainage swales; installation of retaining walls; placement of asphalt concrete pavement; applying striping, markers, and legends; and all other work as shown on the Plans, as called for in the Special Provisions, and as directed by the Engineer. esarlatte@cityofmillvalley.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT