Iron Avenue Storm Drain Improvements
BID DATE
12/18/18 - 1:30
AGENCY
Albuquerque
ESTIMATE
n/a
SCOPE
This project includes the removal of the existing 60" diameter storm drain pipe and replacement with a larger diameter storm drain pipe in Iron Avenue to accommodate the full hydraulic capacity of the Alcalde Pump Station. Additionally, the 66" intake line will be replaced with a 72" by 108" box section at the Alcalde Pump Station. Iron Avenue will also be reconstructed with work that will include roadway, drivepads, parking lot, sidewalks, storm drain inlets, and ADA ramps. tyler.ashton@wilsonco.com