FFY 2016 17 Street Resurfacing
BID DATE
12/20/18 - 2:00
AGENCY
Stockton
ESTIMATE
n/a
SCOPE
The street resurfacing project includes base failure (6 dig-outs), 3 asphalt concrete (AC) overlay with the installation of wheelchair ramps, repairs to existing curb, gutter, detector loops, and hand holes. The scope of work includes Arch Raod (1.16 miles), March Lane (1.35 miles), Pershing Avenue (.5 miles). The total length of roads to be resurfaced is 3.01 miles. Miguel.Mendoza@stocktonca.gov