Access the Full Project by Clicking here!
Bidjugde
JOB
Rancho Solano Zone V Pump Station Replacement
BID DATE
12/4/18 - 2:00
AGENCY
Fairfield
ESTIMATE
n/a
SCOPE
The work generally consists of, but is not limited to the following: furnishing and installing the replacement prefabricated pump station and connection piping; isolation valves; motor controls in Nema 3R MCC pedestal panel with lockable dead front doors, appurtenances, connection piping to existing potable water suction and discharge piping flanges (with dielectric insulated joint materials), new flow meter and restoration of the Project work site as necessary to provide for a complete operating skid mounted pump station with separate bladder tank (minus telemetry equipment transfer by City staff). All equipment shall be installed in accordance with the manufacturer's requirements and recommendations.
PREBID
11/13/2018 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT