Access the Full Project by Clicking here!
Bidjugde
JOB
Sanitary Sewer Rehabilitation Bancroft Allston Byron West Masonic Santa Fe Fifth Le Conte
BID DATE
12/6/18 - 2:00
AGENCY
Berkeley
ESTIMATE
$2,700,000
SCOPE
The work to be done consists of, but is not limited to, the rehabilitation and construction by: a) CIPP (Method 'A') installation of approximately 97 linear feet of 8-inch diameter sanitary sewer. b) Pipe-bursting (Method "B") installation of approximately 3,660 linear feet of 8-inch to 18-inch diameter sanitary sewer. c) Traditional Open-trench (Method "C") installation of approximately 815 linear feet of 8-inch to 14-inch diameter sanitary sewer. d) Replacement of approximately 2,680 linear feet of 4-inch and 6-inch diameter sanitary sewer laterals. e) Construction and rehabilitation of manholes including excavation and related work. California Contractor License Classification required: A General Engineering, or C-34 Pipeline, or C-42 Sanitation System. RSalcedo@CityofBerkeley.info

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT