Access the Full Project by Clicking here!
Bidjugde
JOB
North Avenue Storm Drain Improvement East Phase
BID DATE
12/11/18 - 2:00
AGENCY
Santa Barbara County
ESTIMATE
n/a
SCOPE
The Project generally consists of providing water pollution control; traffic control; installation of approximately 145 linear feet of 24” to 30" diameter storm drain; construction of cast-in-place reinforced concrete catch basins and junction structures, manholes and inlet filters; water, gas, water, telecommunication, traffic signal, street light and sewer facilities protection, replacement or relocation; miscellaneous concrete curb and gutter, sidewalk, vertical curb, access ramps and landings; pavement stripes and markings, inductive loop detector replacement, and asphaltic concrete pavement restoration.
PREBID
12/4/2018 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT