Access the Full Project by Clicking here!
Bidjugde
JOB
(CMAR) Coconino Estates Improvements Phase I
BID DATE
06/6/19 - 7:00
AGENCY
Flagstaff
ESTIMATE
$6,300,000
SCOPE
AWARD 4/2/19: The CMAR Design Phase Services primarily include reviewing and providing input on design, plans, schedules, quantities, costs estimates, subsurface utility investigations, and constructability in coordination with a selected Engineering Professional to prepare comprehensive construction documents and develop the Guaranteed Maximum Price (GMP) for the Project. The CMAR Construction Phase Services generally consist of coordination with various agencies, residents, and the public while performing the construction of the Project. The primary improvements consist of replacing existing water and sewer mains, water and sewer services, asphalt structural section, and select edge improvements (curb & gutter, sidewalk, etc.) for the entire Project limits. Sanitary Sewer Improvements: Replace 5,000 LF of existing sewer main Replace 20 existing sewer manholes Replace 130 existing sewer services from the replaced/new main to the right-of-way. Water Improvements: Replace 6,200 LF of existing water main Replace 130 existing water services from the replaced/new main to the existing meter Replace 30 existing water valves Replace 10 existing fire hydrant assemblies Pavement Improvements: Replace 24,000 SY of existing asphalt structural section Replace affected signage, striping, and roadway markings Edge Improvements: Replace 12,200 LF of select existing curb/gutter Replace 500 SF of select existing sidewalk Replace 500 SF of select existing sidewalk ramps Replace 1,600 SF of select existing valley gutters Replace 1,000 SF of select existing driveways Storm Water Improvements: Resolve runoff conveyance issues within the project limits pbrown@flagstaffaz.gov
UPDATES