Access the Full Project by Clicking here!
Bidjugde
JOB
Drainage Improvement Bid Packet 2
BID DATE
11/29/18 - 2:00
AGENCY
Prescott
ESTIMATE
n/a
SCOPE
The City Drainage Projects Bid Packet #2 generally consists of improvements to roadway and drainage features at three locations throughout the City. This includes the removal and replacement of curb, gutter, pavement and sidewalk to obtain positive drainage conditions within City Right of Way. The locations of the projects are as follows: 1717 Thumb Butte Road: New roll curb, partial pavement replacement and driveway reconstruction adjacent to 1803, 1801, 1717 and 1715 Thumb Butte Road. 1816 Boardwalk Avenue: Partial pavement, sidewalk and driveway replacement, catch basin and storm drain improvement, regrading area to mitigate existing erosion behind existing headwall. 915 Country Club Drive: Partial pavement replacement and driveway regrading to provide positive drainage along Country Club Drive. jeff.low@prescott-az.gov
PREBID
11/13/2018 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT