Canyon Estates Drive Camino Del Norte Improvements
BID DATE
12/13/18 - 2:00
AGENCY
Lake Elsinore
ESTIMATE
n/a
SCOPE
This Project includes the realignment of Canyon Estates Drive and the extension of Camino Del Norte. The limits of the realignment/extension are from approximately 500 feet south of Franklin Street to 1,200 feet south of Main Street. Appurtenant and related work includes, but is not limited to, the construction of roadway grading; roadway pavement; drainage cross culverts, headwalls, wingwalls, flared end sections, and drainage inlets; sidewalks and curb and gutter; traffic signal at the intersection of Canyon Estate Drive-Camino Del Norte at Franklin Street intersection; signing and striping; traffic control and detours where shown on plans, and all other items not mentioned but indicated in the Plans and Specifications. Farid Dost - 951-674-3124 x246 fdost@lake-elsinore.org