Access the Full Project by Clicking here!
Bidjugde
JOB
Mission Inn Booster Station Installation
BID DATE
11/7/18 - 2:00
AGENCY
Riverside
ESTIMATE
$3,423,000
SCOPE
he work to be done, in general, shall include furnishing all labor, materials, tools, equipment, and incidentals, unless otherwise specified, to install permanent trench resurfacing construct the waterline complete in place in accordance with the Plans and Specifications. The project involves the installation of permanent trench paving material and related striping and painting, construction of a potable waterline and appurtenances consisting of approximately, 20 linear feet of 6-inch Ductile Iron Pipe, 2,570 linear feet of 8-inch Ductile Iron Pipe and 2,530 linear feet of 12-inch Ductile Iron Pipe, a Potable Water Booster Pump Station, Demolition of an Existing Aboveground Booster Station and Demolition of an Existing Underground Booster Station
PREBID
10/24/2018 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT