Downtown Riverfront Streetcar Civil Track Structures Stations Systems
BID DATE
01/11/19 - 2:00
AGENCY
Sacramento
ESTIMATE
$98,000,000
SCOPE
1. Downtown/Riverfront Streetcar Civil, Track, Structures, Stations & Systems work;2. Sacramento Light Rail Transit (LRT) Blue Line relocation from K Street between 7th and 12th to H Street between 7th and 12th including Civil, Track, Stations & Systems work;3. Vehicle Maintenance & Storage Facility Civil, Track & Systems work;4. Riverfront Street extension from existing terminus to south of the Pioneer (US 50) Bridge and South 5th Street roadway widening improvements. The work includes, but is not limited to: all earthwork; trackwork; street and parking lot construction; drainage and utilities; associated site work; structures and tunnel modifications, station platforms; shelters; utility buildings; site furniture; planting; tree removal; irrigation; irrigation modification; electrical and lighting; protection of existing shrubs and trees; overhead contact system; underground system ductbanks; traction power substation site work and cable system; wayside signaling and grade crossing warning systems; train-to-wayside (TWC) system; fiber optic backbone and laterals; communication system; foundation work; dust control, noise control, fencing, signage and striping, and paving required to complete the Work. Scott Hatala - 916-556-0471 shatala@sacrt.com
UPDATES