Access the Full Project by Clicking here!
Bidjugde
JOB
Concrete Replacement Program 19R06
BID DATE
11/7/18 - 10:00
AGENCY
Newport Beach
ESTIMATE
$750,000
SCOPE
The work necessary for the completion of this contract consists of distributingnotification door-hangers, placing temporary “No Parking” signs, saw-cutting concrete,removing sidewalk, curb and gutter, driveways and access ramps; removing or pruningtree roots; removing trees; stump grinding, grading parkway around location of treeremoval and installing sod to match existing; removing bushes and vegetation, grading,installing and compacting crushed miscellaneous base, remove and install new sewercleanouts, protecting gas meters, constructing and relocating new electric pull box,constructing new water meter cover and box, constructing sidewalk, curb and gutter,driveways, access ramps, constructing concrete roadway with saw-cut joints, removingexisting rubber mat ADA tiles, cleaning and preparing surface for ADA tiles, installingnew surface applied ADA tiles (vitrified polymer composite), restoring synthetic turf,private irrigation and improvements impacted by the work, installing grass sod asnecessary to match existing, providing temporary access during construction and otherincidental items to complete work in place as required by the contract documents. Ben Davis - 949-644-3317 bdavis@newportbeachca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT