Sacaton Flats Subdivision - Water Phase II
BID DATE
11/12/13 - 2:00
AGENCY
GRIC
ESTIMATE
$500,000
SCOPE
adriana.espinoza@gric.nsn.us The work includes construction of 7,224 LF of 12” PVC and 509 LF of 6” PVC water main from an existing stub out on State Route 87 to the eastern extent of Park Street, north of Sacaton Flats Subdivision 2-1. This work also includes the installation of (12) 12” Resilient Wedge Gate Valves and (1) 6” Resilient Wedge Gate Valve. Work includes coordination with water main construction for the District 2 Multi-Purpose facility, which will have two connections to the 12” water main. Work includes all required fittings, air release valve assemblies, fire hydrants, plugs and appurtenances, testing and approvals, as required by plans and specifications. Work also includes trenching, backfilling, compaction and testing, site clean-up, demobilization, and the preparation of redline “As-Built” plans to be delivered to the Community.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT