Access the Full Project by Clicking here!
Bidjugde
JOB
Phase II Quiet Zone NM 314 Widening NM 147
BID DATE
12/17/18 - 5:00
AGENCY
Pueblo Isleta
ESTIMATE
n/a
SCOPE
Widening, milling and overlaying approximately 1,500 feet of NM 314 to add a northbound right-turn lane and a southbound left-turn lane. Replacement of an existing 48-inch diameter culvert pipe for the Indian Interior Drain with a 72-inch diameter culvert pipe. Extension of a two-foot by three-foot concrete box culvert to accommodate the roadway widening. Construction traffic control, permanent signing and pavement markings, and replacement of an existing water line. poi17501@isletapueblo.com
UPDATES